Newbold Leisure Centre - Royal Leamington Spa
Refurbishment works at Newbold Leisure Centre involved the removal of existing pool–surround tiles & refixing new, which included a considerable amount of levelling works as well as curved cutting up to existing coping stones. There was also nominal tiling to the communal shower area along with mosaic tiling to curved pool columns & floor tiling to the sauna area & pool reception All works were carried out with minimal disruption to the public & completed within budget.
Read other articles
Back